Rebar sourced to the reinforcement specification.
Quantome coordinates reinforcing-steel enquiries for project buyers, contractors and distributors. The governing reinforcement specification takes priority over a generic grade description.
Discuss Your RequirementsOn this page
Reinforcement forms for enquiry.
Rebar is a long steel product, not flat-rolled steel.
| Form | Buyer input |
|---|---|
| Straight bars | Diameter and length schedule, grade and bundle limits. |
| Coiled reinforcement | Coil format and suitability for the specified processing route. |
| Cut and bent requirements | Bar-bending schedule, tolerances and processing scope for feasibility review. |
Grades and technical requirements.
Examples include B500B or B500C under BS 4449, or Grade 60 under the applicable ASTM A615/A706 specification. These are separate designations and must not be treated as equivalents.
| Requirement | What to specify |
|---|---|
| Governing standard | Standard and edition, grade and project requirements. |
| Geometry | Nominal diameter, length, tolerances and rib requirements. |
| Performance | Yield/tensile properties, elongation, ductility and required tests. |
| Welding | State intended welding and applicable chemistry/carbon-equivalent criteria. |
| Quantity | Tonnes or pieces per diameter and length. |
| Project evidence | List any required conformity or project-specific approvals for verification; none are assumed. |
MTC for rebar: relate the test unit to the bundles.
A Mill Test Certificate (MTC) identifies the material and records inspection results against the specified requirements. A rebar enquiry should define the required test evidence as well as diameter and length. The bundle identity must remain readable at receipt.
Quantome coordinates document review and clarification; the manufacturer issues its own material inspection records. An MTC does not make Quantome a certification body.
| MTC check | Buyer review |
|---|---|
| Document type | State the required mill inspection record and EN 10204 type where specified by the order. |
| Heat Number | Match heat or cast references across the certificate and bundle labels. |
| Grade | Check the reinforcement standard, grade and required ductility classification. |
| Chemical analysis | Review the composition and carbon-equivalent information required by the governing specification. |
| Mechanical results | Check applicable yield/tensile results, elongation and bend/rebend evidence. |
| Shipment link | Bundle tags, rolling marks where applicable and packing records must support identification of the supplied batch. |
Applications and acceptance.
Reinforcement is used in concrete structures. Grade selection, detailing and acceptance belong to the project’s engineering specification. Site approval requirements should be stated before comparing offers.
Bundles, loading and shipment.
Specify maximum bundle weight, label information, length restrictions and unloading equipment. Bundle identification should remain accessible after transport.
The delivery quotation must identify the named destination and agreed Incoterm, including responsibility for unloading and any route restrictions.
Sourcing and supply process.
Submit the bar schedule and document requirements. We support supplier identification and screening, clarify specification differences and coordinate the proposed inspection and commercial scope.
Typical buyer requirements.
Include diameter mix, delivery sequence, project standard and any requirement for cut-and-bent material. Trial or split deliveries are subject to supply and logistics confirmation.
Frequently asked questions
Can ASTM and BS reinforcement grades be substituted?
Only after the project’s responsible technical authority accepts the proposed alternative. Matching nominal strength alone is insufficient.
Is every rebar grade suitable for welding?
Do not assume this. Review the ordered standard, chemistry and applicable welding requirements.
Can deliveries follow a construction sequence?
Submit the planned sequence. Supplier production, packing and transport feasibility must be checked before commitment.
Are project approvals included automatically?
No. Identify the precise approval or conformity evidence required so it can be checked for the proposed source.
Related pages
Submit your material requirement.
Send the reinforcement standard, grade, diameter/length schedule and delivery requirements.
Talk to Our Team